Royal Palm Beach building permits
The 9th Edition (2026) of the Florida Building Code takes effect Dec 31, 2026: applications submitted from that day must comply with it.
Roof replacement / re-roof
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
- Proof of ownership City
- Secondary water barrier / re-nailing affidavit City
- Manufacturer specifications / cut sheets City
Depends on your job
- Contractor license / registration
- Survey (signed & sealed)
- Encroachment / hold-harmless agreement
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Window and exterior door replacement
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
- Proof of ownership City
- Construction plans / drawings City
Depends on your job
- Contractor license / registration
- Survey (signed & sealed)
- Encroachment / hold-harmless agreement
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Design wind speed | 170 mph Vult |
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Hurricane shutters / storm panels
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
- Proof of ownership City
- Construction plans / drawings City
- Window / door opening schedule City
Depends on your job
- Contractor license / registration
- Survey (signed & sealed)
- Encroachment / hold-harmless agreement
- HOA / condo association approval
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Garage door replacement
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
- Proof of ownership City
Depends on your job
- Contractor license / registration
- Survey (signed & sealed)
- Encroachment / hold-harmless agreement
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
A/C changeout (like for like)
What to submit
- Permit application County
- Proof of ownership City
Depends on your job
- Contractor license / registration
- Survey (signed & sealed)
- Encroachment / hold-harmless agreement
- A/C replacement data form
- Product approval (Miami-Dade NOA / Florida FL#)
When the job value is over $15,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Water heater
What to submit
- Permit application County
- Proof of ownership City
Depends on your job
- Contractor license / registration
- Survey (signed & sealed)
- Encroachment / hold-harmless agreement
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Fence / gate
What to submit
- Permit application County
- Proof of ownership City
- Survey (signed & sealed) City
Depends on your job
- Encroachment / hold-harmless agreement
- Construction plans / drawings
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Maximum fence height | 6 ft |
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Shed / accessory storage structure
What to submit
- Site plan (or survey) Florida
- Permit application County
- Proof of ownership City
- Construction plans / drawings City
Depends on your job
- Contractor license / registration
- Survey (signed & sealed)
- Lot coverage / impervious area calculation
- Encroachment / hold-harmless agreement
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Shed setback, side | 7.5 ft to 10 ft Sheds must meet the district interior side setback (RS-2 listed Palm Beach Colony plats 7.5 ft); add 1 ft per ft of shed height over 8 ft. By zoning district: RS-1 10 ft, RS-2 10 ft, RS-3 7.5 ft |
| Shed setback, rear | 10 ft Sheds may be 10 ft from the rear property line if no portion exceeds 8 ft in height; parts over 8 ft need 1 more ft of rear and side setback per ft over 8 ft; detached accessory structures no taller than the house |
| Maximum shed height inside the house setbacks | 8 ft The 10 ft rear allowance (inside the house's rear setback) applies only if no portion of the shed exceeds 8 ft; taller sheds sit 1 ft further in per ft over 8 ft |
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Generator / LP tank
What to submit
- Survey (signed & sealed) County
- Load / energy calculations County
- Permit application County
- Proof of ownership City
Depends on your job
- Lot coverage / impervious area calculation
- Contractor license / registration
- Encroachment / hold-harmless agreement
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Swimming pool / spa (new)
What to submit
- Construction plans / drawings Florida
- Permit application County
- Proof of ownership City
- Survey (signed & sealed) City
Depends on your job
- Pool barrier / safety feature form
- Contractor license / registration
- Encroachment / hold-harmless agreement
- Lot coverage / impervious area calculation
- Signed contract / cost estimate
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Pool setback, side | 10 ft to 13 ft Screen enclosures 10 ft from an interior side line, pools 13 ft to the outside of the pool beam (corner side 15 / 18 ft), unless the district says otherwise |
| Pool setback, rear | 5 ft to 13 ft Pools 13 ft and screen enclosures 10 ft from the rear line; 8 ft / 5 ft next to open space or water wider than 50 ft |
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Solar PV
What to submit
- Permit application County
- Proof of ownership City
Depends on your job
- Photos
- Contractor license / registration
- Survey (signed & sealed)
- Encroachment / hold-harmless agreement
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Driveway / pavers / walkway / approach
What to submit
- Site plan (or survey) Florida
- Permit application County
- Proof of ownership City
Depends on your job
- Encroachment / hold-harmless agreement
- Lot coverage / impervious area calculation
- Survey (signed & sealed)
- Product approval (Miami-Dade NOA / Florida FL#)
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Interior remodel / alteration (incl kitchen/bath/flooring)
What to submit
- Permit application County
- Proof of ownership City
Depends on your job
- Construction plans / drawings
- Contractor license / registration
- Survey (signed & sealed)
- Encroachment / hold-harmless agreement
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Palm Beach County Universal County-wide / Municipal Building Permit Application (January 2024 edition) the county-wide form the town accepts
Uploading files
- A complete electronic file compilation of all inspection result reports in PDF format pertaining to the specific Project and Permit Number shall accompany the “Certificate of Compliance.” Private Provider Request Form (PDF)
Built from the building department's own checklists, forms and fee schedules, the county rules and Florida law. Rules change: confirm with the building department before you submit.