SunnyCheck PermitsPermit guide
Submitting in Gulf Stream? Upload the package and get a fix-it list in minutes, before the building department sees it. Your first 3 checks are free.Pre-check my package

← All towns

Gulf Stream building permits

Palm Beach County · rules last read 2026-10-13

Building services: Palm Beach Highland Beach

The 9th Edition (2026) of the Florida Building Code takes effect Dec 31, 2026: applications submitted from that day must comply with it.

Roof replacement / re-roof

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $24,000 job: about $541 Fee Schedule Effective October 1 2026 (PDF) · effective 2026-10-01 to 2027-09-30

Window and exterior door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Design wind speed170 mph Vult

Forms we fill for you

Fee for a $18,000 job: about $406 Fee Schedule Effective October 1 2026 (PDF) · effective 2026-10-01 to 2027-09-30

Hurricane shutters / storm panels

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $8,000 job: about $180 Fee Schedule Effective October 1 2026 (PDF) · effective 2026-10-01 to 2027-09-30

Garage door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $4,500 job: about $154 Fee Schedule Effective October 1 2026 (PDF) · effective 2026-10-01 to 2027-09-30

A/C changeout (like for like)

What to submit

Depends on your job

When the job value is over $15,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

A/C unit distance to the property line12 ft to 15 ft
Minor accessory structures (mechanical equipment, sheds up to 300 sq ft and 18 ft, pools; Sec. 70-51): interior side 12 ft in Gulf Stream Core, North/South and Place au Soleil, 15 ft in Ocean West and Beachfront; rear 15 ft; 20 ft from water connected to...
A/C unit distance to the rear line15 ft
Rear interior/beach 15 ft (beachfront: or the CCCL). Minor accessory structures (mechanical equipment, sheds up to 300 sq ft and 18 ft, pools; Sec. 70-51): interior side 12 ft in Gulf Stream Core, North/South and Place au Soleil, 15 ft in Ocean West and...

Forms we fill for you

Water heater

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fence / gate

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Maximum fence height, side and rear6 ft to 8 ft
Walls/fences along side and rear lines not visible from the street, outside the front setback, measured from lowest adjacent grade; any wall or fence over 8 ft prohibited; over 6 ft prohibited in Core, North/South, Place au Soleil; over 4 ft prohibited...
Maximum fence height, front yard4 ft to 8 ft
Fences between the street and the minor accessory setback line or visible from roadways, measured from lowest adjacent grade; Place au Soleil allows 6 ft open aluminum picket with landscaped barrier, not beyond the front of the building. By zoning...

Forms we fill for you

Fee for a $6,000 job: about $154 Fee Schedule Effective October 1 2026 (PDF) · effective 2026-10-01 to 2027-09-30

Shed / accessory storage structure

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Shed setback, side12 ft to 15 ft
Minor accessory structures (mechanical equipment, sheds up to 300 sq ft and 18 ft, pools; Sec. 70-51): interior side 12 ft in Gulf Stream Core, North/South and Place au Soleil, 15 ft in Ocean West and Beachfront; rear 15 ft; 20 ft from water connected to...
Shed setback, rear15 ft
Minor accessory structures (mechanical equipment, sheds up to 300 sq ft and 18 ft, pools; Sec. 70-51): interior side 12 ft in Gulf Stream Core, North/South and Place au Soleil, 15 ft in Ocean West and Beachfront; rear 15 ft; 20 ft from water connected to...
Maximum shed area inside the house setbacks300 sq ft
A shed over 300 sq ft or 18 ft tall must meet the house setbacks.
Maximum shed height inside the house setbacks18 ft

Forms we fill for you

Fee for a $7,000 job: about $158 Fee Schedule Effective October 1 2026 (PDF) · effective 2026-10-01 to 2027-09-30

Generator / LP tank

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Generator distance to the property line7 ft to 15 ft
Accessory (minor) setbacks: interior side 12 ft (Core, North/South, Place au Soleil) or 15 ft (Ocean West, Beachfront), rear 15 ft; a generator rated 66 dB(A) or less may be 7 ft from any line when those can't be met.
Screening around the generatorRequired (wall, fence or hedge)
Completely, from the street and the neighbors, e.g. a concrete wall and a hedge around it

Forms we fill for you

Fee for a $14,000 job: about $316 Fee Schedule Effective October 1 2026 (PDF) · effective 2026-10-01 to 2027-09-30

Swimming pool / spa (new)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Pool setback, side12 ft to 15 ft
In-ground pools and spas are minor accessory structures. Minor accessory structures (mechanical equipment, sheds up to 300 sq ft and 18 ft, pools; Sec. 70-51): interior side 12 ft in Gulf Stream Core, North/South and Place au Soleil, 15 ft in Ocean West...
Pool setback, rear10 ft to 15 ft
10 ft to the water's edge in Place Au Soleil Addition No. 2; 15 ft elsewhere.

Forms we fill for you

Fee for a $60,000 job: about $1,353 Fee Schedule Effective October 1 2026 (PDF) · effective 2026-10-01 to 2027-09-30

Solar PV

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $28,000 job: about $631 Fee Schedule Effective October 1 2026 (PDF) · effective 2026-10-01 to 2027-09-30

Driveway / pavers / walkway / approach

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $9,000 job: about $203 Fee Schedule Effective October 1 2026 (PDF) · effective 2026-10-01 to 2027-09-30

Interior remodel / alteration (incl kitchen/bath/flooring)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $25,000 job: about $564 Fee Schedule Effective October 1 2026 (PDF) · effective 2026-10-01 to 2027-09-30

Uploading files

Built from the building department's own checklists, forms and fee schedules, the county rules and Florida law. Rules change: confirm with the building department before you submit.