SunnyCheck PermitsPermit guide
Submitting in Boca Raton? Upload the package and get a fix-it list in minutes, before the building department sees it. Your first 3 checks are free.Pre-check my package

← All towns

Boca Raton building permits

Palm Beach County · rules last read 2026-10-13

The 9th Edition (2026) of the Florida Building Code takes effect Dec 31, 2026: applications submitted from that day must comply with it.

Roof replacement / re-roof

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $24,000 job: about $488 User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Window and exterior door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Design wind speed170 mph Vult

Forms we fill for you

Fee for a $18,000 job: about $390 User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Hurricane shutters / storm panels

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $8,000 job: about $226 User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Garage door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $4,500 job: about $168 User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

A/C changeout (like for like)

What to submit

Depends on your job

When the job value is over $15,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $9,000 job: at least $100 (priced per item) User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Water heater

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $1,800 job: at least $100 (priced per item) User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Fence / gate

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Maximum fence height6 ft

Forms we fill for you

Fee for a $6,000 job: about $193 User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Shed / accessory storage structure

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Shed setback, side and rear5 ft
Residential districts: a shed in a required yard goes in the rear yard, at least 5 ft from any plot line measured to the eaves (on corner lots, in the quarter of the lot farthest from the streets); one per plot; never in the front yard or between the house...
Maximum shed area inside the house setbacks500 sq ft
Accessory buildings partly or wholly in a required yard: 500 sq ft at most.
Maximum shed height inside the house setbacks15 ft
Most residential districts (R-3-A to R-5-A follow their own rules).
Shed distance from the house10 ft
10 ft from the house wherever the shed sits.

Forms we fill for you

Fee for a $7,000 job: about $209 User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Generator / LP tank

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $14,000 job: about $324 User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Swimming pool / spa (new)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Pool setback, side and rear10 ft

Forms we fill for you

Fee for a $60,000 job: about $1,078 User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Solar PV

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $28,000 job: about $554 User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Driveway / pavers / walkway / approach

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $9,000 job: about $242 User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Interior remodel / alteration (incl kitchen/bath/flooring)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $25,000 job: about $504 User Fee Schedule 2026 2027 (PDF) · effective 2026-10-01

Uploading files

Built from the building department's own checklists, forms and fee schedules, the county rules and Florida law. Rules change: confirm with the building department before you submit.