Doral building permits
The 9th Edition (2026) of the Florida Building Code takes effect Dec 31, 2026: applications submitted from that day must comply with it. Product approvals: Miami-Dade applies an NOA whose drawings name a code edition only to permits under that edition, so applications from Dec 31, 2026 need NOA revisions approved for the 9th Edition. From Jan 1, 2027 every underlayment under roof tile needs its own NOA (the yellow-stripe prescriptive option ends), and hip and ridge shingles need an NOA showing the UL 2375 test or the prescriptive cement attachment (Miami-Dade Product Control notices of July 31, 2026). Upload each NOA as downloaded from Product Control: its own pages and every stamped drawing sheet.
Roof replacement / re-roof
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Roofing permit application (uniform roofing form) County
- Roof fire classification listing County
- Permit application County
- Secondary water barrier / re-nailing affidavit County
- Proof of ownership City
Depends on your job
- Roof wind uplift calculations (RAS 127 / RAS 128 or engineer's)
- Owner's Notification for Roofing Considerations (FBC 1524)
- Roof-to-wall / hurricane mitigation affidavit
- Contractor license / registration
- Construction plans / drawings
- Manufacturer specifications / cut sheets
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- HVHZ Uniform Roofing Application required with every re-roof in the High-Velocity Hurricane Zone
Window and exterior door replacement
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Construction plans / drawings County
- Permit application City
- Proof of ownership City
Depends on your job
- Special inspector form
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Hurricane shutters / storm panels
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application City
- Proof of ownership City
Depends on your job
- HOA / condo association approval
- Contractor license / registration
- Construction plans / drawings
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Garage door replacement
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application City
- Proof of ownership City
Depends on your job
- Contractor license / registration
- Construction plans / drawings
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
A/C changeout (like for like)
What to submit
- Permit application County
- Proof of ownership City
Depends on your job
- Construction plans / drawings
- Equipment tie-down / anchoring detail (or product approval / wind load calculations)
- Contractor license / registration
When the job value is over $15,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| A/C unit distance to the property line | 2 ft A/C unit may project 3.5 ft into setback, min 2 ft from property line |
Water heater
What to submit
- Permit application City
- Proof of ownership City
Depends on your job
- Contractor license / registration
- Construction plans / drawings
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Fence / gate
What to submit
- Site plan (or survey) Florida
- Permit application County
- Proof of ownership City
Depends on your job
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Maximum fence height | 8 ft Fence and wall height limited to 8 ft |
Shed / accessory storage structure
What to submit
- Site plan (or survey) Florida
- Product approval (Miami-Dade NOA / Florida FL#) (or construction plans / drawings) County
- Survey (signed & sealed) (or site plan) County
- Permit application City
- Proof of ownership City
Depends on your job
- Contractor license / registration
- Construction plans / drawings
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Shed setback, side and rear | 5 ft to 7.5 ft Storage buildings at homes: 5 ft from the property line up to 120 sq ft; 7.5 ft for 121 to 300 sq ft. |
Generator / LP tank
What to submit
- Site plan (or survey) Florida
- Permit application City
- Proof of ownership City
Depends on your job
- Contractor license / registration
- Construction plans / drawings
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Generator distance to the property line | 3 ft Residential zones: interior side 3 ft, rear 5 ft, behind the front and side-street building lines and at least 10 ft from a side street line; propane or natural gas, at most 5 ft tall; one per house. |
| Generator distance to the rear line | 5 ft Residential zones: rear 5 ft. |
| Screening around the generator | Required (wall, fence or hedge) From view, by a wall or hedge |
Swimming pool / spa (new)
What to submit
- Construction plans / drawings Florida
- Site plan (or survey) Florida
- Pool barrier / safety feature form County
- Permit application City
- Proof of ownership City
Depends on your job
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Pool setback | 6 ft Swimming pool: 6 ft from property line (Table 5 special residential setbacks) |
Solar PV
What to submit
- Construction plans / drawings County
- Permit application City
- Proof of ownership City
Depends on your job
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Driveway / pavers / walkway / approach
What to submit
- Site plan (or survey) Florida
- Permit application City
- Proof of ownership City
Depends on your job
- Encroachment / hold-harmless agreement
- Lot coverage / impervious area calculation
- Survey (signed & sealed)
- Product approval (Miami-Dade NOA / Florida FL#)
- Contractor license / registration
- Construction plans / drawings
- HOA / condo association approval
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Interior remodel / alteration (incl kitchen/bath/flooring)
What to submit
- Permit application City
- Proof of ownership City
Depends on your job
- Construction plans / drawings
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Uploading files
- Flatten All PDFs First! Permit Submittal Guidelines (web page)
- Please do not add any additional/optional security from your PDF software or certification authority. “Locking” or “Restricting” the document before you submit the file can prevent us from opening and processing the document or stamping it Permit Submittal Guidelines (web page)
- All files shall be appropriately named according to NAMING CONVENTIONS and should only be submitted as PDFs. All other formats such as img, jpeg, tiff will NOT be accepted. Permit Submittal Guidelines (web page)
- When submitting documentation (specifications, calculations, NOAs, etc.) - please submit each file as one combined PDF and named accordingly, “Specs”, “Structural Calcs” etc. Permit Submittal Guidelines (web page)
- All drawings and supporting documents in the plan package must be in PDF format. UploadGuidelines (PDF)
- PDF files shall have only one layer (flattened) without any embedded objects. UploadGuidelines (PDF)
- PDF files shall not be encrypted, or password protected. UploadGuidelines (PDF)
- Documents should be scanned at no greater than 300 dpi. UploadGuidelines (PDF)
- The file name shall not contain: i. Any leading or trailing spaces. ii. Special characters such as: parenthesis “( )”; double periods “..”; question marks “?”; etc. UploadGuidelines (PDF)
- Each file shall contain the discipline code as the first letter of the file name, followed by a user definable numerical field that closely corresponds to the sheet sequence number. i. For example, A-101 UploadGuidelines (PDF)
- Plan must be submitted as one PDF per plan sheet. UploadGuidelines (PDF)
- Calculations shall be grouped in one PDF, with pages numbered and scanned in consecutive order with cover page as first page. UploadGuidelines (PDF)
- All pages belonging to one NOA or one Florida approval shall be grouped in one PDF, cover pages and installation details pages together in one PDF, no isolated pages shall be submitted. Prepare one PDF for each NOA or Florida Approval. UploadGuidelines (PDF)
- Create one PDF file per discipline to contain the corresponding drawings, ex: (A-1, A-2, A-last in one ARCHITECTURAL PDF file, one ELECTRICAL, one PLUMBING, etc.). digital files and batch submittals guidance document (PDF)
Built from the building department's own checklists, forms and fee schedules, the county rules and Florida law. Rules change: confirm with the building department before you submit.