Bal Harbour building permits

Miami-Dade County · rules last read 2026-10-14

The 9th Edition (2026) of the Florida Building Code takes effect Dec 31, 2026: applications submitted from that day must comply with it. Product approvals: Miami-Dade applies an NOA whose drawings name a code edition only to permits under that edition, so applications from Dec 31, 2026 need NOA revisions approved for the 9th Edition. From Jan 1, 2027 every underlayment under roof tile needs its own NOA (the yellow-stripe prescriptive option ends), and hip and ridge shingles need an NOA showing the UL 2375 test or the prescriptive cement attachment (Miami-Dade Product Control notices of July 31, 2026). Upload each NOA as downloaded from Product Control: its own pages and every stamped drawing sheet.

Roof replacement / re-roof

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $24,000 job: about $789 Building Permits Fee Schedule 2022 (PDF) · effective July 1, 2022

Window and exterior door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Fee for a $18,000 job: about $592 Building Permits Fee Schedule 2022 (PDF) · effective July 1, 2022

Hurricane shutters / storm panels

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Fee for a $8,000 job: about $263 Building Permits Fee Schedule 2022 (PDF) · effective July 1, 2022

Garage door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Fee for a $4,500 job: about $167 Building Permits Fee Schedule 2022 (PDF) · effective July 1, 2022

A/C changeout (like for like)

What to submit

Depends on your job

When the job value is over $15,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

A/C unit distance to the side line10 ft
Mechanical equipment can't sit in the required side yard (R-2 single-family: 10 ft, more for parts of a house over 18 ft)
A/C unit distance to the rear lineAllowed within the setbacks
The rule covers side yards only

Water heater

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Fence / gate

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Maximum fence height, side and rear6 ft
Residential side/rear yards

Fee for a $6,000 job: about $197 Building Permits Fee Schedule 2022 (PDF) · effective July 1, 2022

Shed / accessory storage structure

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Shed setback, side10 ft
R-1 and R-2: no Building (an accessory building is a subordinate Building, Sec. 21-1) nearer than 10 ft to a side lot line for single-story construction up to 18 ft high; +1 ft per ft above 18 ft.
Shed setback, rear15 ft to 40 ft
R-2: 15 ft from rear lot lines; R-1: 15 ft from the rear line abutting the street and 40 ft from the seawall (stored as _strict).

Fee for a $7,000 job: about $230 Building Permits Fee Schedule 2022 (PDF) · effective July 1, 2022

Generator / LP tank

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Generator distance to the side line10 ft
Mechanical equipment can't sit in the required side yard (R-2 single-family: 10 ft, more for parts of a house over 18 ft)
Generator distance to the rear lineAllowed within the setbacks
The rule covers side yards only
Screening around the generatorRequired (wall, fence or hedge)
From view, by a wall or hedge

Fee for a $14,000 job: about $460 Building Permits Fee Schedule 2022 (PDF) · effective July 1, 2022

Swimming pool / spa (new)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Pool setback, side and rear10 ft
R-2: pools 10 ft from the side and rear lines (decks not counted); 15 ft from a street on a corner lot; screened by a 5 ft wall, fence or hedge

Fee for a $60,000 job: about $1,973 Building Permits Fee Schedule 2022 (PDF) · effective July 1, 2022

Solar PV

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Fee for a $28,000 job: about $921 Building Permits Fee Schedule 2022 (PDF) · effective July 1, 2022

Driveway / pavers / walkway / approach

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Fee for a $9,000 job: about $296 Building Permits Fee Schedule 2022 (PDF) · effective July 1, 2022

Interior remodel / alteration (incl kitchen/bath/flooring)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Fee for a $25,000 job: about $822 Building Permits Fee Schedule 2022 (PDF) · effective July 1, 2022

Built from the building department's own checklists, forms and fee schedules, the county rules and Florida law. Rules change: confirm with the building department before you submit.