Sunrise building permits

Broward County · rules last read 2026-10-14

The 9th Edition (2026) of the Florida Building Code takes effect Dec 31, 2026: applications submitted from that day must comply with it. Product approvals: Miami-Dade applies an NOA whose drawings name a code edition only to permits under that edition, so applications from Dec 31, 2026 need NOA revisions approved for the 9th Edition. From Jan 1, 2027 every underlayment under roof tile needs its own NOA (the yellow-stripe prescriptive option ends), and hip and ridge shingles need an NOA showing the UL 2375 test or the prescriptive cement attachment (Miami-Dade Product Control notices of July 31, 2026). Upload each NOA as downloaded from Product Control: its own pages and every stamped drawing sheet.

Roof replacement / re-roof

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $24,000 job: about $456 town document (PDF) · effective 10/01/2025

Window and exterior door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Site-specific design pressures above a mean roof height of30 ft

Forms we fill for you

Fee for a $18,000 job: about $339 town document (PDF) · effective 10/01/2025

Hurricane shutters / storm panels

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $8,000 job: about $339 town document (PDF) · effective 10/01/2025

Garage door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $4,500 job: about $339 town document (PDF) · effective 10/01/2025

A/C changeout (like for like)

What to submit

Depends on your job

When the job value is over $15,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $9,000 job: about $228 town document (PDF) · effective 10/01/2025

Water heater

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $1,800 job: about $228 town document (PDF) · effective 10/01/2025

Fence / gate

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Maximum fence height, side and rear6 ft
Maximum fence height, front yard4 ft

Forms we fill for you

Fee for a $6,000 job: about $228 town document (PDF) · effective 10/01/2025

Shed / accessory storage structure

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Shed setback, side and rear5 ft
Maximum shed area inside the house setbacks100 sq ft
Sec. 16-118(a)(1)a: the side/rear-yard shed exception applies up to 100 sq ft.
Maximum shed height inside the house setbacks9 ft
Sec. 16-118(a)(1)a: a storage shed up to 9 ft tall and 100 sq ft may sit in a side or rear yard 5 ft from the line (not abutting a street); other sheds meet the district setbacks.

Forms we fill for you

Fee for a $7,000 job: about $339 town document (PDF) · effective 10/01/2025

Generator / LP tank

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $14,000 job: about $456 town document (PDF) · effective 10/01/2025

Swimming pool / spa (new)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Pool setback, side and rear5 ft

Forms we fill for you

Fee for a $60,000 job: about $1,590 town document (PDF) · effective 10/01/2025

Solar PV

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $28,000 job: about $456 town document (PDF) · effective 10/01/2025

Driveway / pavers / walkway / approach

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $9,000 job: about $507 town document (PDF) · effective 10/01/2025

Interior remodel / alteration (incl kitchen/bath/flooring)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $25,000 job: about $1,409 town document (PDF) · effective 10/01/2025

Uploading files

Built from the building department's own checklists, forms and fee schedules, the county rules and Florida law. Rules change: confirm with the building department before you submit.