SunnyCheck PermitsPermit guide
Submitting in Plantation? Upload the package and get a fix-it list in minutes, before the building department sees it. Your first 3 checks are free.Pre-check my package

← All towns

Plantation building permits

Broward County · rules last read 2026-10-14

The 9th Edition (2026) of the Florida Building Code takes effect Dec 31, 2026: applications submitted from that day must comply with it. Product approvals: Miami-Dade applies an NOA whose drawings name a code edition only to permits under that edition, so applications from Dec 31, 2026 need NOA revisions approved for the 9th Edition. From Jan 1, 2027 every underlayment under roof tile needs its own NOA (the yellow-stripe prescriptive option ends), and hip and ridge shingles need an NOA showing the UL 2375 test or the prescriptive cement attachment (Miami-Dade Product Control notices of July 31, 2026). Upload each NOA as downloaded from Product Control: its own pages and every stamped drawing sheet.

Roof replacement / re-roof

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Window and exterior door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Site-specific design pressures above a mean roof height of30 ft

Forms we fill for you

Hurricane shutters / storm panels

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Garage door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

A/C changeout (like for like)

What to submit

Depends on your job

When the job value is over $15,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

A/C unit distance to the property line2.5 ft

Forms we fill for you

Water heater

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fence / gate

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Maximum fence height, side and rear6 ft
Interior lots: side and rear setback areas; measured from existing grade.
Maximum fence height, front yard4 ft
Front street setback area; corner lots: 4 ft in the secondary street setback except where 6 ft is allowed; 4 ft where a fence blocks fire access in a setback; 5 ft on RS-1EP lots with horses.

Forms we fill for you

Shed / accessory storage structure

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Maximum shed height10 ft
Single-family lots; area 150 sq ft or 5% of the home, whichever is greater (not recorded as a fixed cap)
Shed setback, side4 ft to 25 ft
Single-family districts except RS-1EP: utility sheds may intrude into the interior side or rear setback keeping 10 ft, or the district's own smaller setback (27-310(d)); street setbacks not reduced. Other residential districts: the district's structural...
Shed setback, rear5 ft to 25 ft
Single-family districts except RS-1EP: utility sheds may intrude into the interior side or rear setback keeping 10 ft, or the district's own smaller setback (27-310(d)); street setbacks not reduced. Other residential districts: the district's structural...

Forms we fill for you

Generator / LP tank

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Generator distance to the property line2.5 ft

Forms we fill for you

Swimming pool / spa (new)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Pool setback, side and rear7 ft
Minimum pool barrier height4 ft

Forms we fill for you

Solar PV

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Driveway / pavers / walkway / approach

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Interior remodel / alteration (incl kitchen/bath/flooring)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Uploading files

Built from the building department's own checklists, forms and fee schedules, the county rules and Florida law. Rules change: confirm with the building department before you submit.