Hallandale Beach building permits
The 9th Edition (2026) of the Florida Building Code takes effect Dec 31, 2026: applications submitted from that day must comply with it. Product approvals: Miami-Dade applies an NOA whose drawings name a code edition only to permits under that edition, so applications from Dec 31, 2026 need NOA revisions approved for the 9th Edition. From Jan 1, 2027 every underlayment under roof tile needs its own NOA (the yellow-stripe prescriptive option ends), and hip and ridge shingles need an NOA showing the UL 2375 test or the prescriptive cement attachment (Miami-Dade Product Control notices of July 31, 2026). Upload each NOA as downloaded from Product Control: its own pages and every stamped drawing sheet.
Roof replacement / re-roof
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
- Roofing permit application (uniform roofing form) County
- Rooftop equipment affidavit (BORA Policy 22-03) County
- Asbestos survey / notice County
- Roof fire classification listing County
- Secondary water barrier / re-nailing affidavit City
- Owner's Notification for Roofing Considerations (FBC 1524) City
Depends on your job
- Roof-to-wall / hurricane mitigation affidavit
- HOA / condo association approval
- Construction plans / drawings
- Contractor license / registration
- Special inspector form
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
- HVHZ Uniform Roofing Application required with every re-roof in the High-Velocity Hurricane Zone
- Mandatory Countywide Rooftop Mounted Equipment Affidavit (BORA Policy 22-03) filed with every re-roof: tick the equipment on the roof (or none) and sign
Fee for a $24,000 job: about $846 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Window and exterior door replacement
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
- Window / door opening schedule County
Depends on your job
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Site-specific design pressures above a mean roof height of | 30 ft |
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $18,000 job: about $677 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Hurricane shutters / storm panels
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
Depends on your job
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $8,000 job: about $391 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Garage door replacement
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
Depends on your job
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $4,500 job: about $285 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
A/C changeout (like for like)
What to submit
- Permit application County
- A/C replacement data form County
- AHRI certificate County
Depends on your job
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
When the job value is over $15,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| A/C unit distance to the property line | 3 ft RS/RD (single-family/duplex) zones. 3 ft is the absolute floor; equipment may also project no more than 4 ft into the required setback, so where the required yard is deeper than 7 ft the minimum distance is (setback - 4 ft). A minimum 3 ft clear passage... |
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $9,000 job: at least $80 (priced per item) Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Water heater
What to submit
- Permit application County
- Water heater replacement data form County
Depends on your job
- AHRI certificate
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $1,800 job: about $258 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Fence / gate
What to submit
- Site plan (or survey) Florida
- Permit application County
Depends on your job
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Maximum fence height, side and rear | 6.5 ft Residential districts. The printed sentence omits 'over' before 'six and one-half feet'; read as a 6.5 ft maximum (same checklist allows 'a maximum height of six and one-half feet' in front yards of qualifying developments). Residential lots abutting... |
| Maximum fence height, front yard | 4 ft Residential districts (single-family RS). Exception in the same sentence: 6.5 ft allowed in the front yard in townhouse/multifamily developments with 6+ units, or single-family communities with 6+ homes controlled by a developer or HOA. Hedges may be 6 in... |
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $6,000 job: about $330 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Shed / accessory storage structure
What to submit
- Site plan (or survey) Florida
- Permit application County
Depends on your job
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Maximum shed height | 15 ft Storage structures: not over one story or 15 ft in height. |
| Maximum shed area | 150 sq ft Storage structures incidental to a permitted use (accessory use in all districts): not over 150 sq ft gross floor area, one per development site, not living quarters. |
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $7,000 job: about $361 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Generator / LP tank
What to submit
- Site plan (or survey) Florida
- Permit application County
Depends on your job
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Generator distance to the property line | 3 ft The form's heading lists the equipment it covers as 'A/C units Pool filters/pump Solar panels Generators/etc.', so the Sec. 32-552(c) rule is applied to generators. RS/RD zones; also max 4 ft projection into the required setback and 3 ft clear passage. The... |
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $14,000 job: about $565 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Swimming pool / spa (new)
What to submit
- Construction plans / drawings Florida
- Site plan (or survey) Florida
- Permit application County
- Pool barrier / safety feature form City
- Manufacturer specifications / cut sheets City
Depends on your job
- HOA / condo association approval
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Pool setback, side | 10 ft Residential accessory pools (32-673): pool and screen enclosure permitted in any rear yard, not less than 10 ft from any rear yard or side lot line, or 12 ft from the face of any seawall. |
| Pool setback, rear | 10 ft to 12 ft Pool and screen enclosure in the rear yard: not less than 10 ft from the rear lot line; 12 ft from the face of any seawall (stored as _strict). |
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $60,000 job: about $1,856 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Solar PV
What to submit
- Permit application County
Depends on your job
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $28,000 job: about $958 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Driveway / pavers / walkway / approach
What to submit
- Survey (signed & sealed) Florida
- Permit application County
Depends on your job
- Encroachment / hold-harmless agreement
- Lot coverage / impervious area calculation
- Product approval (Miami-Dade NOA / Florida FL#)
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $9,000 job: about $422 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Interior remodel / alteration (incl kitchen/bath/flooring)
What to submit
- Permit application County
Depends on your job
- Construction plans / drawings
- HOA / condo association approval
- Contractor license / registration
- Asbestos survey / notice
- Elevation certificate
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fee for a $25,000 job: about $874 Building Permits Fee Booklet (PDF) · effective FY 2024-2025
Uploading files
- The first part of the file name will be any alphanumeric number you have assigned to each page. Example: L1 Landscaping, E1 Electrical, etc. Electronic Submittals Naming Format (PDF)
- TIP! Use the same name format to insert a revised plan page into the existing plans in the order you wish it to appear. Example: C1 Site Plan (Original); S1 Site Plan (1) = (Revised/Correction) Electronic Submittals Naming Format (PDF)
- PLANS: PLANS MUST BE SAVED AS AN INDIVIDUAL PDF FILE. Electronic Submittals Naming Format (PDF)
- APPLICATIONS: EACH APPLICATION TYPE MUST BE SAVED AS MULTIPAGE PDF FILE Electronic Submittals Naming Format (PDF)
- PLANS: PLANS MUST BE SAVED AS AN INDIVIDUAL PDF FILE. APPLICATIONS: EACH APPLICATION TYPE MUST BE SAVED AS MULTIPAGE PDF FILE Electronic Submittals Naming Format (PDF)
- NOTE: Only Drawings need Page Numbers in the file name. See next page for Applications and Document names. Electronic Submittals Naming Format (PDF)
Built from the building department's own checklists, forms and fee schedules, the county rules and Florida law. Rules change: confirm with the building department before you submit.