Broward County · rules last read 2026-10-14

The 9th Edition (2026) of the Florida Building Code takes effect Dec 31, 2026: applications submitted from that day must comply with it. Product approvals: Miami-Dade applies an NOA whose drawings name a code edition only to permits under that edition, so applications from Dec 31, 2026 need NOA revisions approved for the 9th Edition. From Jan 1, 2027 every underlayment under roof tile needs its own NOA (the yellow-stripe prescriptive option ends), and hip and ridge shingles need an NOA showing the UL 2375 test or the prescriptive cement attachment (Miami-Dade Product Control notices of July 31, 2026). Upload each NOA as downloaded from Product Control: its own pages and every stamped drawing sheet.

Roof replacement / re-roof

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $24,000 job: about $412 Building Fee Schedule 2025 (PDF) · effective October 1, 2026

Window and exterior door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Site-specific design pressures above a mean roof height of30 ft

Forms we fill for you

Fee for a $18,000 job: about $309 Building Fee Schedule 2025 (PDF) · effective October 1, 2026

Hurricane shutters / storm panels

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $8,000 job: about $138 Building Fee Schedule 2025 (PDF) · effective October 1, 2026

Garage door replacement

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $4,500 job: about $78 Building Fee Schedule 2025 (PDF) · effective October 1, 2026

A/C changeout (like for like)

What to submit

Depends on your job

When the job value is over $15,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

A/C unit distance to the property line5 ft

Forms we fill for you

Water heater

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fence / gate

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Maximum fence height, side and rear6 ft
Residential side/rear yards
Maximum fence height, front yard4 ft
Residential front yard

Forms we fill for you

Fee for a $6,000 job: about $79 Building Fee Schedule 2025 (PDF) · effective October 1, 2026

Shed / accessory storage structure

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Shed setback, side and rear5 ft
Front yard: required setback; side and rear 5 ft; behind the rear building line.
Maximum shed area inside the house setbacks150 sq ft
Measured from the drip line; a larger shed meets the district's yard requirements.

Forms we fill for you

Fee for a $7,000 job: about $80 Building Fee Schedule 2025 (PDF) · effective October 1, 2026

Generator / LP tank

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Generator distance to the property line5 ft

Forms we fill for you

Fee for a $14,000 job: about $240 Building Fee Schedule 2025 (PDF) · effective October 1, 2026

Swimming pool / spa (new)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Limits

Pool setback, side and rear10 ft

Forms we fill for you

Fee for a $60,000 job: about $1,029 Building Fee Schedule 2025 (PDF) · effective October 1, 2026

Solar PV

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $28,000 job: about $480 Building Fee Schedule 2025 (PDF) · effective October 1, 2026

Driveway / pavers / walkway / approach

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $9,000 job: about $155 Building Fee Schedule 2025 (PDF) · effective October 1, 2026

Interior remodel / alteration (incl kitchen/bath/flooring)

What to submit

Depends on your job

When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).

Forms we fill for you

Fee for a $25,000 job: about $429 Building Fee Schedule 2025 (PDF) · effective October 1, 2026

Uploading files

Built from the building department's own checklists, forms and fee schedules, the county rules and Florida law. Rules change: confirm with the building department before you submit.