Coconut Creek building permits
The 9th Edition (2026) of the Florida Building Code takes effect Dec 31, 2026: applications submitted from that day must comply with it. Product approvals: Miami-Dade applies an NOA whose drawings name a code edition only to permits under that edition, so applications from Dec 31, 2026 need NOA revisions approved for the 9th Edition. From Jan 1, 2027 every underlayment under roof tile needs its own NOA (the yellow-stripe prescriptive option ends), and hip and ridge shingles need an NOA showing the UL 2375 test or the prescriptive cement attachment (Miami-Dade Product Control notices of July 31, 2026). Upload each NOA as downloaded from Product Control: its own pages and every stamped drawing sheet.
Roof replacement / re-roof
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
- Roofing permit application (uniform roofing form) County
- Rooftop equipment affidavit (BORA Policy 22-03) County
- Asbestos survey / notice County
- Roof fire classification listing County
Depends on your job
- Roof-to-wall / hurricane mitigation affidavit
- HOA / condo association approval
- Signed contract / cost estimate
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Roof-to-wall retrofit required when the building is insured for at least | $300,000 Retrofit cost cap 15% of roof cost |
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
- HVHZ Uniform Roofing Application required with every re-roof in the High-Velocity Hurricane Zone
- Mandatory Countywide Rooftop Mounted Equipment Affidavit (BORA Policy 22-03) filed with every re-roof: tick the equipment on the roof (or none) and sign
Window and exterior door replacement
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
- Window / door opening schedule County
Depends on your job
- Construction plans / drawings
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Site-specific design pressures above a mean roof height of | 30 ft |
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Hurricane shutters / storm panels
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
- Window / door opening schedule City
Depends on your job
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Garage door replacement
What to submit
- Product approval (Miami-Dade NOA / Florida FL#) Florida
- Permit application County
- Window / door opening schedule City
Depends on your job
- Contractor license / registration
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
A/C changeout (like for like)
What to submit
- Permit application County
- A/C replacement data form County
- AHRI certificate County
Depends on your job
- Contractor license / registration
- Product approval (Miami-Dade NOA / Florida FL#)
When the job value is over $15,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Water heater
What to submit
- Permit application County
- Water heater replacement data form County
Depends on your job
- AHRI certificate
- Contractor license / registration
- Product approval (Miami-Dade NOA / Florida FL#)
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Fence / gate
What to submit
- Site plan (or survey) Florida
- Permit application County
Depends on your job
- Contractor license / registration
- Product approval (Miami-Dade NOA / Florida FL#)
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Maximum fence height, side and rear | 6 ft Residential side/rear yards |
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Shed / accessory storage structure
What to submit
- Site plan (or survey) Florida
- Permit application County
Depends on your job
- Contractor license / registration
- Product approval (Miami-Dade NOA / Florida FL#)
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Shed setback, side | 5 ft to 35 ft Smallest single-family district side setback (RS-5: 5 ft per lot). By zoning district: RS-1 35 ft, RS-3 10 ft, RS-4 7.5 ft, RS-5 5 ft |
| Shed setback, rear | 5 ft Sheds up to 80 sq ft; a larger one is an accessory structure held to the district's own setbacks. |
| Maximum shed area inside the house setbacks | 80 sq ft The code text reads 'eight (80)'; the next sentence confirms 80 sq ft. Sheds must also be screened from public view (opaque fence, or landscaping on three sides). |
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Generator / LP tank
What to submit
- Site plan (or survey) Florida
- Permit application County
Depends on your job
- Contractor license / registration
- Product approval (Miami-Dade NOA / Florida FL#)
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Swimming pool / spa (new)
What to submit
- Construction plans / drawings Florida
- Site plan (or survey) Florida
- Permit application County
Depends on your job
- Contractor license / registration
- Product approval (Miami-Dade NOA / Florida FL#)
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Limits
| Pool setback, side and rear | 5 ft |
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Solar PV
What to submit
- Permit application County
Depends on your job
- Contractor license / registration
- Product approval (Miami-Dade NOA / Florida FL#)
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Driveway / pavers / walkway / approach
What to submit
- Site plan (or survey) Florida
- Permit application County
Depends on your job
- Encroachment / hold-harmless agreement
- Lot coverage / impervious area calculation
- Survey (signed & sealed)
- Product approval (Miami-Dade NOA / Florida FL#)
- Contractor license / registration
- Construction plans / drawings
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Interior remodel / alteration (incl kitchen/bath/flooring)
What to submit
- Permit application County
Depends on your job
- Construction plans / drawings
- Contractor license / registration
- Product approval (Miami-Dade NOA / Florida FL#)
When the job value is over $5,000, a Notice of Commencement must be recorded, posted at the job and a copy filed with the building department before the first inspection (F.S. 713.135).
Forms we fill for you
- Broward County Uniform Building Permit Application (rev. 01-08-2026) the county-wide form the town accepts
Uploading files
- Files are to be uploaded right side up in .pdf* format ONLY. epermits tutorial (web page)
- Permit applications are to be uploaded one application per file epermits tutorial (web page)
- Plans must be uploaded individually and labeled for what plan page it is (ex. E.1, S1.2 etc.) epermits tutorial (web page)
- The name of each file should include which application and/or what the document is. Use numbers to distinguish between multiple applications for the same discipline epermits tutorial (web page)
- NOA's/Product Approvals must be labeled with the number form the cover sheet epermits tutorial (web page)
- Note: Uploaded documents must be regular unlocked PDF files. building department (web page)
Built from the building department's own checklists, forms and fee schedules, the county rules and Florida law. Rules change: confirm with the building department before you submit.